Error message

  • The specified file temporary://fileyZZ7Pk could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filegsUPhT could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileMeWCJr could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Smart Bus and Traffic infrastructure

Regions: 
Pillars: 
Liveability
Sectors: 
Urban Transport/NMT/Walkability
Projects Name: 
Smart Bus and Traffic infrastructure